Trade-offs and open decisions

Some requirements pull against each other. These conflicts come from the sources themselves: policy against practice, one design parameter against another, a legal duty against a design property. Each one says what was chosen, what it costs, and who decides.

  • 13 conflicts set out
  • 7 resolved by the source hierarchy or the architecture
  • 6 waiting on a ministry ruling
  1. C-1 PRIORITIZE (policy), with INNOVATE (Option 3) Resolved

    Policy against practice on the right to challenge

    Decision: Option 3. Every request is recorded, and the pre-decision communication tells clients truthfully where they stand. Who decides: The source hierarchy settles the requirement. The ministry (ADM Policy and Program Design) is asked to correct the procedures (DEP-10).

    Conflicting Requirements:

    • Requirement A: FR-055. A reconsideration request is always accepted and recorded, and the independent unit decides whether reconsideration is available (FR-056).
    • Requirement B: Current procedures. Staff are told "Do not offer the right to reconsideration" when food vouchers are denied RECON-C1; overpayment workers are told to answer a request with "there is nothing to reconsider"; and the brochure is held back when an overpayment is notified (RC-01, RC-14).

    Stakeholders Involved:

    • Reconsideration and Administrative Fairness Unit and the policy authority: policy gives an unconditional right to ask.
    • Front-line service delivery: procedures were written to stop early or pointless requests and keep queues manageable.

    Nature of Conflict:

    • A request cannot both be refused at the counter and recorded. In practice, the worker decides whether reconsideration is available, which they have no authority to do.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Follow policy. Record every request and decide availability centrally✅ Lawful<br>✅ Consistent across channels❌ More requests reach the independent unitPolicy authority satisfied; the unit's workload rises
    Option 2: Follow practice. Allow refusal at the point of contact✅ Fewer requests❌ Contradicts policy, which takes precedence<br>❌ Refusals nobody can reviewRejected by the source hierarchy
    Option 3: Record every request, and use the pre-decision communication to tell clients that no decision has been made yet (FR-006)✅ Lawful<br>✅ Fewer pointless requests, because clients know where they stand❌ Needs the proposal objectMeets each side's underlying interest

    Resolution Strategy: PRIORITIZE (policy), with INNOVATE (Option 3)

    Decision: Option 3. Every request is recorded, and the pre-decision communication tells clients truthfully where they stand.

    Rationale: Policy takes precedence over practice (BC-1). The ministry's own intake practice already uses the pre-decision pattern correctly (NOTE-001).

    Decision Authority: The source hierarchy settles the requirement. The ministry (ADM Policy and Program Design) is asked to correct the procedures (DEP-10).

    Impact on Requirements:

    • Added: FR-006 (pre-decision communication), FR-056 (availability decided by the independent unit).
    • Recorded: RC-01 and RC-14 as practice defects for the ministry to correct.

    Stakeholder Management:

    • Front-line service delivery (bears the cost): the pre-decision communication gives workers a correct, scripted route. The independent unit's request volume is monitored.

    Future Consideration:

    • After M7, measure request volume by channel and adjust staffing, not the right.
  2. C-2 COMPROMISE Resolved

    A history that is never changed against the duty to destroy records

    Decision: Option 3 (TA §B.7; decision D13). Who decides: Ministry Records Officer with the Privacy Officer and the Chief Architect (D13), before the first production event.

    Conflicting Requirements:

    • Requirement A: FR-008, DR-001. A permanent history that can be replayed, with nothing overwritten.
    • Requirement B: NFR-C-003, DR-004. Records destroyed on schedule, and one person's records destroyed where a duty or order requires it.

    Stakeholders Involved:

    • Chief Architect: a tribunal examines whether decisions can be reproduced.
    • Records Officer and Privacy Officer: destroying records on schedule is a legal duty.

    Nature of Conflict:

    • A store that never forgets cannot destroy anything, and a store that destroys records cannot replay everything.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Encrypt everything per person and destroy keys✅ Any one person's records can be destroyed❌ The most expensive method for every fact<br>❌ The conflict between backing up keys and destroying them applies everywhereOver-built
    Option 2: Never destroy anything in the event store✅ Full replay forever❌ Breaks the records dutyRejected
    Option 3: A disposal method per fact class, a published shred-survivor list, typed placeholders for destroyed facts, and an advance statement of what can no longer be reproduced✅ Meets each duty where it applies<br>✅ Cost in proportion❌ Replay is limited for people whose records were destroyed, and this must be said in advanceBoth duties met, with a stated limit

    Resolution Strategy: COMPROMISE

    Decision: Option 3 (TA §B.7; decision D13).

    Rationale: The common duty is scheduled disposal of a whole class of records, not erasure on request. Designing the whole store around the rare case buys the wrong capability.

    Decision Authority: Ministry Records Officer with the Privacy Officer and the Chief Architect (D13), before the first production event.

    Impact on Requirements:

    • Modified: FR-008 carries the declared limit on replay; DR-004 requires the survivor list before the first event.

    Stakeholder Management:

    • Chief Architect (loses unlimited replay): the limit is declared before the first disposal, not discovered at the first challenge.

    Future Consideration:

    • Revisit the method for each fact class once the ARCS/ORCS schedules are obtained (DEP-09).
  3. C-3 INNOVATE Open

    Reaching every client against a verification check tied to how they are paid

    Decision: Option 3, subject to a ministry ruling (DEP-10). Until then, clients can choose office pickup as a payment channel, but it is never used as the check. Who decides: ADM Policy and Program Design.

    Conflicting Requirements:

    • Requirement A: FR-086, BR-009. Outcomes do not depend on channel, and electronic payment is available.
    • Requirement B: OB-SU-61. Hardship cheques are sent to the local office so that eligibility is re-checked every month.

    Stakeholders Involved:

    • Head of Service Delivery Operations and clients: reach and dignity; clients should not have to visit an office every month to get paid.
    • Policy authority and compliance: hardship eligibility re-checked every month.

    Nature of Conflict:

    • One mechanism meets two requirements. Paying electronically removes the monthly check PRIN-C8.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Keep sending cheques to the office✅ Check preserved❌ Clients must travel to an office to be paidClients bear the cost
    Option 2: Pay electronically and drop the check✅ Better reach❌ Removes a policy controlCompliance bears the risk
    Option 3: Separate the two. A monthly re-check work item that applies whatever the channel (FR-040), with the client choosing how to be paid✅ Both requirements met❌ Needs a policy ruling on what counts as a re-checkBoth met if policy agrees

    Resolution Strategy: INNOVATE

    Decision: Option 3, subject to a ministry ruling (DEP-10). Until then, clients can choose office pickup as a payment channel, but it is never used as the check.

    Rationale: N15 has exposed two requirements met by one mechanism, which nobody saw until it was written down (PRIN N15).

    Decision Authority: ADM Policy and Program Design.

    Impact on Requirements:

    • Modified: FR-040 makes the monthly re-check a work item whatever the channel.

    Stakeholder Management:

    • Compliance (loses the incidental check): a stated re-check that can be audited replaces an unstated one.

    Future Consideration:

    • The same pattern may exist elsewhere. Phase D should look for controls that depend on a channel.
  4. C-4 INNOVATE Resolved

    Changing policy quickly against releasing rules that will stand up at tribunal

    Decision: Option 3 (commitment 2; TA §C.4.3). Who decides: The Chief Architect and the ADM Policy and Program Design, jointly, as the authority that can relax commitment 2.

    Conflicting Requirements:

    • Requirement A: BR-010. Policy staff release rate changes on their effective date without a software release.
    • Requirement B: FR-090, FR-091, FR-003. Release needs a second person's approval, legal sign-off, a regression test set, approval of decision classes, and no unresolved date conflicts.

    Stakeholders Involved:

    • ADM Policy and Program Design: changes take effect on the date the minister sets.
    • Chief Architect and legal counsel: every release must stand up at tribunal.

    Nature of Conflict:

    • Every check slows release. Removing checks makes releases harder to defend.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Rules written in code and released with software✅ Engineering controls❌ Every rate change waits for a software releasePolicy frustrated
    Option 2: Analysts release rules freely✅ Speed❌ Releases that cannot be defendedLegal exposure
    Option 3: An automated release pipeline. Simulation, regression and classification checks run automatically; people only review and give legal sign-off, and do so before the effective date✅ Speed and defensibility❌ The pipeline must be funded as a productBoth met

    Resolution Strategy: INNOVATE

    Decision: Option 3 (commitment 2; TA §C.4.3).

    Rationale: Release and effect are separate. A rule released early takes effect on its stated date.

    Decision Authority: The Chief Architect and the ADM Policy and Program Design, jointly, as the authority that can relax commitment 2.

    Impact on Requirements:

    • Added: FR-091 blocks rules with date conflicts; DEP-14 tests analyst capability.

    Stakeholder Management:

    • Policy (loses the ability to release alone): policy staff run the pipeline themselves, and the capability test proves they can before D3 is final.

    Future Consideration:

    • If DEP-14 fails, improve the authoring tools rather than remove the checks.
  5. C-5 COMPROMISE Resolved

    Automated decisions at scale against the need for a human decision-maker

    Decision: Option 3. Who decides: The statutory decision-maker for each program authorises each class (FR-093). The program policy authority approves the classification on legal advice.

    Conflicting Requirements:

    • Requirement A: NFR-P-003, BR-004. Decisions and payments for the whole caseload, on time.
    • Requirement B: FR-003, FR-052, NFR-C-005. A human must decide any adverse decision based on inferred data, and every overpayment.

    Stakeholders Involved:

    • Service delivery operations: volume and timeliness.
    • Statutory decision-makers and legal counsel: lawful administrative decisions.

    Nature of Conflict:

    • Human review of every decision cannot keep up with the volume. Elsewhere, decisions with no human review have produced unlawful debt at scale.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: A person reviews every decision✅ Safe❌ Unworkable volume; late decisions change what clients are owed (FR-061)Clients harmed by delay
    Option 2: Automate everything✅ Fast❌ Unlawful for discretionary decisions and adverse decisions based on inferenceRejected
    Option 3: Classify each output. Automate only verified administrative decisions with no discretion, under the four conditions in TA §D.5.2. A person decides anything involving discretion or inference, and every overpayment. A class is suspended automatically if challenges succeed too often✅ Automates where lawful<br>✅ Safe where not❌ Classification has to be governedBoth met, class by class

    Resolution Strategy: COMPROMISE

    Decision: Option 3.

    Rationale: What the comparator jurisdiction lacked was a rule about which outputs count as decisions (TA §D.5).

    Decision Authority: The statutory decision-maker for each program authorises each class (FR-093). The program policy authority approves the classification on legal advice.

    Impact on Requirements:

    • Added: FR-093 register and suspension triggers.

    Stakeholder Management:

    • Service delivery (loses full automation): volume by class is published every cycle, so the line between automated and human decisions is argued from evidence.

    Future Consideration:

    • Review each class every year, and whenever challenges pass their trigger.
  6. C-6 PHASE Open

    Paying on time against verifying first

    Decision: Option 3, pending a ministry ruling on which checks may be done after payment (DEP-10). Who decides: Program policy authority.

    Conflicting Requirements:

    • Requirement A: NFR-A-008. No client's payment waits on another organisation's gateway. Decisions go ahead on the evidence held and are flagged for later checking.
    • Requirement B: FR-015. Mandatory third-party checks at application and review, unless a registered deferral applies.

    Stakeholders Involved:

    • Clients and service delivery: payment on the due date.
    • Compliance and the policy authority: eligibility checked before assistance is paid.

    Nature of Conflict:

    • When the exchange is down, the system must either pay without a mandatory check or hold the payment.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Hold every decision until checks complete✅ Checks preserved❌ Payment depends on an outside gatewayClients bear the outages
    Option 2: Always go ahead and check later✅ Payment on time❌ Breaks the mandatory-check policy where no deferral appliesCompliance risk
    Option 3: Go ahead only where a registered deferral applies or policy allows checking after payment; otherwise use emergency issuance under authority (FR-047) and reconcile later✅ Lawful and on time❌ Needs policy to state the deferral casesBoth met within policy

    Resolution Strategy: PHASE

    Decision: Option 3, pending a ministry ruling on which checks may be done after payment (DEP-10).

    Rationale: For this failure, the architecture names the program policy authority as the one who decides whether to go ahead on the evidence held (TA §E.8.3).

    Decision Authority: Program policy authority.

    Impact on Requirements:

    • Modified: NFR-A-008 applies only to cases policy allows.

    Stakeholder Management:

    • Compliance: every check done after payment is a tracked work item with its own deadline.

    Future Consideration:

    • Revisit once the exchange commits to an availability target (DEP-06).
  7. C-7 COMPROMISE Resolved

    Keeping old reports and interfaces working against the detail the new record holds

    Decision: Option 3 (TA §C.2.6; DR-014, DR-015). Who decides: The Policy Directors accept the published losses for each part of the system and each group of clients; the Coexistence Lead owns the mechanism.

    Conflicting Requirements:

    • Requirement A: DR-014. Write changes back to the old system for groups of clients the new system has taken over, so old reports, batch jobs and interfaces not yet moved keep working.
    • Requirement B: DR-001, DR-002. The new record holds dates, lifecycle and source detail the old system's structure cannot hold.

    Stakeholders Involved:

    • Users of the old systems and operations staff: things keep working while both systems run.
    • Program policy authority: accountable for what a rollback loses.

    Nature of Conflict:

    • Writing back always loses detail, so every day in state S2 is a day on an incomplete copy.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: No write-back; move every user of the old data in one cutover✅ No loss❌ The single-cutover risk the evidence from other jurisdictions rules outRejected
    Option 2: Write back indefinitely✅ Old systems keep working❌ Running both systems becomes permanentHow the predecessor programme failed
    Option 3: Write back for a limited time and with limited detail. The losses are published and accepted per fact class, and a retirement date is set when each group moves✅ Old systems keep working, at a stated cost and with an end date❌ Named losses must be acceptedBoth met, with a stated limit

    Resolution Strategy: COMPROMISE

    Decision: Option 3 (TA §C.2.6; DR-014, DR-015).

    Rationale: Claiming a move can be reversed without saying what is lost means the cost has not been worked out.

    Decision Authority: The Policy Directors accept the published losses for each part of the system and each group of clients; the Coexistence Lead owns the mechanism.

    Impact on Requirements:

    • Added: DR-015's published list of losses, including the difference between a correction and a supersession.

    Stakeholder Management:

    Future Consideration:

    • Retire each user of the old data as parts of the system reach state S3.
  8. C-8 PHASE Resolved

    Building the ministry-specific parts against buying a platform

    Decision: Option 3 (DEP-19). This document does not assume a particular solution, so it can serve as the baseline for that evaluation (A-7). Who decides: ED Digital Services with the ADM Policy and Program Design (D3), assessed by someone other than the owners of the parts.

    Conflicting Requirements:

    • Requirement A: NFR-I-006. Buy generic capability, have any decision to build assessed independently, and evaluate the whole platform against commercial and reusable case management platforms.
    • Requirement B: The architecture's list of parts to build (the evidence store, the decision machinery, case handling, the translation layer, the exchange's authorization and evidence services, overpayment, appeals, and identity matching) (TA §C.18.1).

    Stakeholders Involved:

    • ED Digital Services and ADM Policy and Program Design: own D3 and the rules platform.
    • Chief Architect: owns the reasons for each part to be built.

    Nature of Conflict:

    • The architecture has not applied its own build-or-buy test to the platform as a whole, and three of its eight build decisions fail that test (PRIN N11).

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Build the list as written✅ Keeps the architecture as it is❌ Fails the architecture's own ruleThe largest open question stays open
    Option 2: Buy a commercial case management platform✅ Off-the-shelf capability❌ Not assessed against the legal requirements here (replay, three-date evidence, deadlines)Unknown fit
    Option 3: Evaluate the whole platform against these requirements, assessed independently, before procurement✅ Decision based on evidence❌ Takes time before procurementDecision waits for evidence

    Resolution Strategy: PHASE

    Decision: Option 3 (DEP-19). This document does not assume a particular solution, so it can serve as the baseline for that evaluation (A-7).

    Rationale: By the architecture's own rules, leaving this unanswered is a compliance failure PRIN-C9.

    Decision Authority: ED Digital Services with the ADM Policy and Program Design (D3), assessed by someone other than the owners of the parts.

    Impact on Requirements:

    • Unchanged: requirements are stated as outcomes, and the architecture commitments that apply are named as such.

    Stakeholder Management:

    • Chief Architect (build list open to challenge): each build decision keeps its requirement-based reason, which is tested rather than thrown out.

    Future Consideration:

    • Record the result in an ADR, and amend this document where the result changes a requirement.
  9. C-9 PHASE Open

    Two statutes set different placement priorities for an Indigenous child

    Decision: Option 1, pending a legal ruling on which statute governs (MQ-023). Who decides: Legal counsel to the ministry, with the Indigenous Child Welfare Director.

    Conflicting Requirements:

    • Requirement A: the placement priority in section 16(1) of the federal Act, which places a parent first and separates family from community.
    • Requirement B: the placement priority in section 71(3) of the CFCSA, which does neither. The adoption policy and the care plan form follow it; Policy 1.1 follows the federal order.

    Stakeholders Involved:

    • Indigenous governing bodies and communities: the federal Act sets minimum standards for their children.
    • Directors and delegated workers: must record which order was applied to each placement.

    Nature of Conflict:

    • The two orders can give different answers for the same child. Which governs, and whether the federal order reaches adoption matching, is a legal question the source hierarchy does not answer.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Hold both orders as rule data and record which was applied, with the reasons✅ Builds now<br>✅ No change when the question is answered❌ The system cannot say a placement is out of orderDecision stays with the director
    Option 2: Build one order✅ The system can test a placement❌ May be the wrong order in lawRejected until counsel rules

    Resolution Strategy: PHASE

    Decision: Option 1, pending a legal ruling on which statute governs (MQ-023).

    Rationale: A rule held as data can be changed on its effective date (BR-010). A rule built into the system cannot.

    Decision Authority: Legal counsel to the ministry, with the Indigenous Child Welfare Director.

    Impact on Requirements:

    • Recorded: the placement priority requirement in group CF2 holds both orders and the reasons for each placement.

    Stakeholder Management:

    • Indigenous governing bodies: the notice of a significant measure tells them of the placement decided.

    Future Consideration:

    • When the ruling is made, release the governing order as a dated rule.
  10. C-10 PRIORITIZE (the statutes) Resolved

    One view of a child against records each service line must keep apart

    Decision: Option 2. The statutes prevail over convenience. Who decides: The source hierarchy settles the requirement. The Ministry Privacy Officer rules on any class of record not covered.

    Conflicting Requirements:

    • Requirement A: BR-012 and FR-032. A worker sees the history they need, and a supervisor sees caseloads across programs.
    • Requirement B: BR-022 and the requirements in groups CF10, CF12, CF15 and CF18. Support needs staff and child protection staff do not open each other's records without consent or a written request. Youth justice information is kept out of the mental health record. A restricted record is seen only by a named group.

    Stakeholders Involved:

    • Workers and supervisors: need the full picture to keep a child safe.
    • Children, youth and families: the statutes limit who may see what was collected for one purpose.

    Nature of Conflict:

    • A shared person index and a composite view show that a record exists. In these services the existence of a record is often the sensitive fact.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: One view, filtered by role✅ Simple for workers❌ A filter that fails shows everythingRejected: a restricted record is a different type, not a hidden field (TA §B.6)
    Option 2: Limits on use travel with each record class, and the index answers only what the asker may know (N21)✅ Lawful<br>✅ The limit survives every copy❌ A worker may not learn that another line knows the childEach line keeps its own record; sharing goes through a recorded consent or request

    Resolution Strategy: PRIORITIZE (the statutes)

    Decision: Option 2. The statutes prevail over convenience.

    Rationale: Legislation comes first (BC-7). FR-080 already requires a barred use to be blocked at the point of use.

    Decision Authority: The source hierarchy settles the requirement. The Ministry Privacy Officer rules on any class of record not covered.

    Impact on Requirements:

    • Added: criteria on FR-084 for a record class a federal statute governs.
    • Open: what happens to a restriction when a record transfers or is jointly managed is stated in no source.

    Stakeholder Management:

    • Workers (bear the cost): the duty to report a child in need of protection is unaffected, and a written request under the Act remains the route to another line's record.

    Future Consideration:

    • Measure, in discovery for M9, how often a worker needed a record they could not see.
  11. C-11 PHASE Open

    A store that never overwrites against provisions that require removal

    Decision: Option 1 is preferred, subject to decision D13 on how each fact class is destroyed (DEP-07). Who decides: Ministry Records Officer with the Privacy Officer.

    Conflicting Requirements:

    • Requirement A: BR-007 and DR-004. History is permanent, and disposal is designed before the first record.
    • Requirement B: adoption and privacy provisions that require information to be removed: registry information when a registration ends, the proposal package from an applicant's record on decline or disruption, and misdirected information that the privacy statute treats as not collected only if it is deleted or returned.

    Stakeholders Involved:

    • Ministry Records Officer and Privacy Officer: own disposal.
    • Adoptive applicants, birth parents and adopted people: the Act protects their information.

    Nature of Conflict:

    • These are removals on an event in one person's matter, not disposal of a class of records on a schedule. C-2 settled the second and did not consider the first.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Treat each removal as a disposal event under DR-004, with a record that the removal happened✅ One mechanism❌ Needs per-record disposal, not only per-classExtends decision D13
    Option 2: Hold these classes outside the permanent store✅ Simple removal❌ A second store with its own controlsAgainst N05

    Resolution Strategy: PHASE

    Decision: Option 1 is preferred, subject to decision D13 on how each fact class is destroyed (DEP-07).

    Rationale: The removal is a legal duty; the fact that it happened is itself a record the ministry must be able to show.

    Decision Authority: Ministry Records Officer with the Privacy Officer.

    Impact on Requirements:

    • Added: a criterion on DR-004 for the minimum retention the privacy statute sets.
    • Open: per-record removal is not yet a requirement.

    Stakeholder Management:

    • Records Officer: the classes concerned are listed in the data requirements for children's services.

    Future Consideration:

    • Settle with D13, before the first production event.
  12. C-12 PHASE Open

    One payment point against immediate payments drawn on another ministry's account

    Decision: Open, pending ADR-010 and the Executive Financial Officer's decision (DEP-35). Group CF13 states the requirements for the office route so that either option can be built. Who decides: Executive Financial Officer.

    Conflicting Requirements:

    • Requirement A: FR-042. Every payment passes through one issuance service.
    • Requirement B: ministry finance policy. Immediate office payments for children's services are drawn on a bank account managed by another ministry, on its own cheque stock, with cheques printed in the office.

    Stakeholders Involved:

    • Executive Financial Officer: owns payment controls.
    • Offices: need to put money in a caregiver's or family's hands the same day.

    Nature of Conflict:

    • A second route to the bank is a second set of controls, audited separately (TA §C.6.8).

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Bring immediate payments through the issuance service, with an urgent channel✅ One set of controls❌ Depends on same-day issuance being available in officesOffice cheque stock requirements fall away
    Option 2: Keep the office route and reconcile it✅ No change for offices❌ Two routesThe office cheque requirements in group CF13 stand

    Resolution Strategy: PHASE

    Decision: Open, pending ADR-010 and the Executive Financial Officer's decision (DEP-35). Group CF13 states the requirements for the office route so that either option can be built.

    Rationale: The architecture's position is one chokepoint; current policy describes two.

    Decision Authority: Executive Financial Officer.

    Impact on Requirements:

    • Conditional: the requirements for office-printed cheques and cheque stock in group CF13.

    Stakeholder Management:

    • Offices: no change until a same-day route through the issuance service is proven.

    Future Consideration:

    • Decide with ADR-010.
  13. C-13 PRIORITIZE (N02, N13) Open

    One writer for each record against partners who keep their own

    Decision: Option 1 for Indigenous authorities. For delegated agencies and integrated teams, open until DEP-27, DEP-29 and DEP-31 are decided. Who decides: Chief Architect, with the Indigenous Child Welfare Director.

    Conflicting Requirements:

    • Requirement A: BR-011 and N05. Exactly one writer for each record at any moment.
    • Requirement B: the policies. A delegated Indigenous agency may record in its own case system. Each employer on an Integrated Child and Youth team keeps its own clinical record, with a shared summary held elsewhere. An Indigenous authority that takes over a matter takes the record with it (FR-084).

    Stakeholders Involved:

    • Delegated agencies, health authorities and Indigenous authorities: hold records under their own authority.
    • The ministry: remains answerable for what it did while the matter was its own.

    Nature of Conflict:

    • The same child's matter is written in more than one system by design. Which is the record, and for which period, must be stated or two systems will each believe they hold it.

    Trade-off Analysis:

    OptionProsConsImpact
    Option 1: Each party is the one writer of its own record; what crosses is evidence with its source (N02)✅ Matches the law<br>✅ No merge❌ No single fileIntegrations, not shared screens
    Option 2: All parties work in the ministry's system✅ One file❌ Misstates custodianship; outside the ministry's authority for an Indigenous authorityRejected for Indigenous authorities (TA §B.8)

    Resolution Strategy: PRIORITIZE (N02, N13)

    Decision: Option 1 for Indigenous authorities. For delegated agencies and integrated teams, open until DEP-27, DEP-29 and DEP-31 are decided.

    Rationale: An Indigenous governing body is a sovereign taking over a function, not a partner receiving a feed (TA §B.8).

    Decision Authority: Chief Architect, with the Indigenous Child Welfare Director.

    Impact on Requirements:

    • Recorded: integrations with delegated agencies' systems and the integrated teams' shared record are listed in §Integration Requirements.

    Stakeholder Management:

    • Delegated agencies: listed first among external users with direct access (INT-013).

    Future Consideration:

    • Decide in the architecture decision record under DEP-31.

Dependencies

Decisions and sources the requirements wait on, with their owners.

Target dates are relative, as the architecture gives them, because no programme start date has been set. Status is as at the date of this document.

DependencyDescriptionOwnerTarget DateStatusImpact if Delayed
DEP-01List of every old system that reads, writes or runs program logic (TA §A.6 row 5)Executive Director, Application ServicesDay 45At Risk. The ARC-001-APP-v1.0 draft covers 61 applications, and practice shows 28 more tools workers useHIGH
DEP-02List of every integration, each one named (TA §C.13)Programme Chief ArchitectMonth 4 of Module 0At Risk. 224 interfaces listed; categories still openHIGH
DEP-03Signed commitment of capacity from the old platform's configuration team (TA §A.6 row 1)Executive Director, Vendor and Contract ManagementDay 60At RiskHIGH
DEP-04Decision D3: build or buy the platform for writing rulesED Digital Services with ADM Policy and Program DesignDay 90At RiskHIGH
DEP-05Decision D12: what counts as "storage" when Protected C data is processedProvincial CISO with Ministry Privacy OfficerDay 45 (longest lead time)At RiskHIGH
DEP-06Written commitment on the exchange's availability target, funding for its authorization service, and deployment model (TA §A.6 row 2, §C.3.9)Executive Director, provincial exchange programme, with Ministry CIOModule 0 funding approvalAt RiskHIGH
DEP-07Decisions D10 and D13: how history is migrated, and how each fact class is destroyedChief Architect with Records Officer; Records Officer with Privacy OfficerBefore the first production eventBlocked. Depends on DEP-09HIGH
DEP-08Decision D8: the agreement registry as the only source of authority for accessMinistry Privacy Officer with Legal ServicesDesign freezeAt RiskHIGH
DEP-09ARCS/ORCS records schedules under the Information Management Act obtained; work plan for disposal classes and the shred-survivor list (TA §A.6 row 7)Ministry Records OfficerDay 60Blocked. Not yet obtainedHIGH
DEP-10Ministry rulings on: 9 rules with conflicting effective dates; the conflicting count of identification documents; criteria for rescinding PWD designation; the warrant shelter calculation; 14 practice conflicts and 18 practice rules with no policy basis; 15 adjudicability rows with at least one value unsettledADM Policy and Program DesignBefore each affected rule is releasedBlocked. Not yet referredHIGH
DEP-11Obtaining Tier 3 sources: 18 decision spreadsheets (5 decide entitlement), about 85 SOPs, about 90 HR forms and letters, 29 intranet documents, the Health Supplement Summary and the hardship category hierarchyRequirements lead with ministry ownerPhase AAt RiskMEDIUM
DEP-12Capacity and response table (TA §C.15.1) filled in from monitoring dataMinistry CTO with operations directorateDesign freezeAt RiskHIGH
DEP-13Check of about 200 decisions to see whether each can be rebuilt from recorded evidencePolicy Directors90-day evidence programmeAt RiskHIGH
DEP-14Test of whether policy analysts can write and release rulesADM Policy and Program DesignDay 90At RiskMEDIUM
DEP-15Standing panel to rule on policy interpretation, and a written position on errors found in the old system (TA §A.6 row 8)ADM Policy and Program DesignBefore the first shadow comparisonAt RiskHIGH
DEP-16Legal decisions on: how each class of overpayment is recovered, interest, whether interim assistance is recoverable when an appeal is dismissed, signature tiers, the legal basis for exchange with the tribunal, and data residencyLegal counsel to the ministry with the Programme Policy ExecutiveDesign freezeAt RiskHIGH
DEP-17Obligation, rules and adjudicability registers for child care subsidy, employment services and child protection (BR-014)Chief Architect with each program policy authorityBefore each program family's module startsAt Risk. Not startedHIGH
DEP-18Phase G user stories and Phase H validation by practitioners (METH §5)Requirements lead with regional operationsBefore design freezeAt Risk. Only the 36-story pilot existsMEDIUM
DEP-19Independently assessed build-versus-buy evaluation of the whole platform (N11)ED Digital Services, assessed independentlyBefore procurementAt Risk. Not startedHIGH
DEP-20Confirmation of the deployed identity-service version and whether it supports token exchange and rich authorization requestsMinistry CTO with provincial identity service ownerWithin 60 days of programme startAt RiskMEDIUM
DEP-21Added v1.5. The corporate financial system's cutoff calendar, how long each posting blackout lasts, and whether it accepts back-dated postings when it reopens (TA §C.6.6). Decides whether queued posting (NFR-A-005) is enoughExecutive Financial Officer with the corporate financial system's service ownerDesign freezeAt RiskHIGH
DEP-22Added v1.5. The numbers behind the emergency payment triggers, and the ceilings per cycle and per client (TA §C.6.9; FR-047)Head of Service Delivery Operations with the Executive Financial Officer and the Programme Policy ExecutiveEnd of Module 0; rehearsed in the first business-continuity exerciseAt RiskHIGH
DEP-23Added v1.5. Write-off thresholds, the delegated authority schedule, and whether administrative-error debt is written off automatically when it is classified (TA §C.7.4; FR-053)Executive Financial Officer with legal counselEnd of Module 0At RiskMEDIUM
DEP-24Added v1.5. The caps on automated raising per cycle and the threshold for reviewing a group of overpayments together (TA §C.7.6; FR-052)Overpayment & Recovery business ownerBefore the first live determination in any contextAt RiskHIGH
DEP-25Added v1.5. Adoption of the default for migrated facts whose date of knowledge is unknown, the standard of evidence for reclassifying, and the authority of the person who may do it; with the measured share of legacy facts whose date can be decoded, inferred or not recovered, over at least 10,000 records (TA §C.7.5; FR-051, DR-013). Sets the size of the recoverable population and so the recovery workloadProgramme Policy Executive with legal counsel; the layer's technical lead for the measurementDesign freeze; measurement by month 4 of Module 0At RiskHIGH
DEP-26Added v1.6. Scope: whether the replacement covers child and youth mental health work, which policy requires to be documented solely in its own clinical system. Decides group CF15Ministry CIO with the program policy authority for child and youth mental healthBefore discovery for M9 closesOpenHIGH
DEP-27Added v1.6. Scope: whether the replacement holds the Integrated Child and Youth teams' shared record or exchanges with it. The record is run today for all partner employers by another ministry. Decides group CF16Ministry CIO with the program policy authorityBefore discovery for M9 closesOpenMEDIUM
DEP-28Added v1.6. Scope: whether the replacement covers youth justice. The manual never names the system being replaced CFDOBLG-C1. Decides groups CF17 and CF18Ministry CIO with the Provincial Director of Youth JusticeBefore discovery for M9 closesOpenHIGH
DEP-29Added v1.6. Whether the 2005 and 2009 standards for delegated Indigenous agencies remain in force. They differ from current ministry policy on time limits, reportable circumstances, removal clauses, file closure and family care homes, at the same tier, so the source hierarchy cannot settle it. Every requirement marked provisional on them waits on thisProvincial Director of Child Welfare with the Indigenous Child Welfare DirectorBefore M9 is scopedOpenHIGH
DEP-30Added v1.6. Documents the requirements need and do not hold: the Children and Youth in Care Policies (Chapter 5), Resource Work Policies (Chapter 8), the youth transitions policy, the ministry complaints policy, the records schedules, the current delegation matrix, the expenditure directives, and the others on ARC-001-CFD-v0.6-acquisition-list.csvProgram policy authority for each areaBefore M9 is scopedAt Risk. 46 items listedHIGH
DEP-31Added v1.6. Architecture decision: how many case contexts the eight service lines need, and where agreements, court proceedings and the register of Indigenous laws and agreements sit in the context map. A change to the domain model, so it needs a decision record before any designChief ArchitectBefore discovery for M9 closesOpen. Not startedHIGH
DEP-32Added v1.6. How each time limit set by policy is counted. 296 of the 1,058 limits in the register give no unit of days. The Interpretation Act settles statutory periods onlyProgram policy authority for each areaBefore any clock is registeredOpenHIGH
DEP-33Added v1.6. Answers to the 111 questions for the ministry (ARC-001-CFD-RECON-v0.2-ministry-questions.md) and to the further questions the requirement authors raised under Open. None has been put to the ministryProgram policy authority for each areaBefore M9 is scopedOpen. Not sentHIGH
DEP-34Added v1.6. Whether contracted agencies in the early years and inclusion programs work in the ministry's system or keep their own files and report statistics. Group CF11 assumes the second; the service contracts that would settle it are not heldProgram policy authority for early years and inclusionBefore M9 is scopedOpenMEDIUM
DEP-35Added v1.6. Whether offices continue to print cheques on local stock, and whether immediate office payments stay on a bank account managed by another ministry (C-12; ADR-010)Executive Financial OfficerWith ADR-010OpenMEDIUM
DEP-36Added v1.6. Commencement of the self-government amendments not yet in the consolidated Acts, including an Indigenous governing body's consent to adoptionLegal counsel to the ministryBefore M9 is scopedOpenMEDIUM
DEP-37Added v1.6. Extraction of the federal Youth Criminal Justice Act, and acquisition of the Youth Custody Regulation, the privacy and mental health regulations and the Provincial Court (CFCSA) Rules, so that policy can be checked against themChief ArchitectWith DEP-28OpenMEDIUM
DEP-38Added v1.6. Whether the replacement masters delegation records or receives them from the provincial delegation database policy namesProvincial Director of Child Welfare with the Chief ArchitectBefore discovery for M9 closesOpenMEDIUM
DEP-39Added v1.6. Whether the adoption registries and the search service are inside the replacement. They rest on the Adoption Act alone; no ministry policy for running them is heldProvincial Director of AdoptionBefore M9 is scopedOpenLOW

Risks to the requirements

These are risks to the requirements themselves: whether they are complete, well sourced and testable. Programme risks are outside this project's scope (_parked-governance/).

Risk IDDescriptionProbabilityImpactMitigation StrategyOwner
R-1Requirements copied from the old system's behaviour repeat its known defects. One entitlement stated in policy is reached today only by a manual adjustment, and the documented workaround calculates it wronglyHIGHHIGHSource hierarchy (BC-1); rules written from policy; old system used only as a comparison, with its own class for old-system defects (FR-095); ministry position on errors found in the old system before shadowing (DEP-15)ADM Policy and Program Design
R-2Only 9.5% of procedures were compared with policy, so practice rules with no policy basis and further conflicts remain unfoundHIGHMEDIUMFinish Phase D; treat practice-only rules as provisional (FR-091)Requirements lead
R-3Platform requirements do not fit the program families not yet analysedMEDIUMHIGHBR-014; re-test platform requirements against each family's registerChief Architect
R-4Conflicting effective dates in policy mean decisions in the affected periods cannot be replayed with certaintyHIGHMEDIUMDATE-CONFLICT status blocks release (FR-091); rulings (DEP-10)ADM Policy and Program Design
R-5The spreadsheets that decide entitlement have not been obtained, so their rules are unknownHIGHHIGHObtain them (DEP-11); treat their logic as unauthorised until a policy citation is foundRequirements lead
R-6Continuity requirements are dropped as unsourced because N16 has no basis in the policy manualMEDIUMHIGHFind the authority outside the manual (financial administration, records, service commitments); keep NFR-A requirements as MUST_HAVEMinistry CIO
R-7Without measured volumes, the non-functional sizing and the decision on combined caseworker screens cannot be supportedHIGHHIGHDEP-12; no approval of combined screens before the table existsMinistry CTO
R-8The records schedules have not been obtained, so disposal design, and therefore the first production event, is blockedHIGHHIGHTreat DEP-09 as a Module 0 critical-path itemMinistry Records Officer
R-9Older policy text was never published, so fewer old decisions can be fully replayed than statedMEDIUMMEDIUMCapture history when first loaded (DR-008); declare the replay horizon before the first decision (FR-008)Chief Architect with Records Officer
R-10The assumption that decisions can be rebuilt from evidence fails for programs that rely heavily on discretionMEDIUMHIGHDEP-13 sample; record discretionary input as a registered evidence type; start with smaller rule setsPolicy Directors
R-11The design rests on terms the architecture has not settled: three names for decision classes, a list of tribunal outcomes wider than the law allows, and a context model with no place for information governanceHIGHMEDIUMFR-003, FR-099 and NOTE-003 raise each with the Chief Architect; requirements use one set of termsChief Architect
R-12Policy analysts cannot write rules on the chosen platform, so rate changes stay tied to software releasesMEDIUMMEDIUMDEP-14 before D3 is finalADM Policy and Program Design
R-13A deadline register built from the obligation registers merges different clocks, because 18 clock identifiers are reused across partitionsHIGHMEDIUMFR-061 requires identifiers unique across the system; re-key them while building the registerRequirements lead
R-14Added v1.6. The children and family requirements have had one author each and no second reader. An author may have misread a passage or missed oneMEDIUMHIGHEach requirement cites quotations checked against the source; a blind second read of a sample, as was done for the register; practitioner validation (Phase H)Chief Architect
R-15Added v1.6. Requirements rest on the 2005 and 2009 delegated-agency standards, whose standing is unconfirmedHIGHMEDIUMMarked provisional; DEP-29Provincial Director of Child Welfare
R-16Added v1.6. Whole subjects have no requirement because the governing policy is not held: the working care plan, the ministry's own foster homes, the ministry complaints process, the use of autism fundingHIGHHIGHProvisions dispositioned practice-only and listed in the ledger; DEP-30Program policy authority for each area
R-17Added v1.6. Requirements by different authors overlap where packs shared provisions; cross-referenced, not merged. A builder may implement the same duty twiceMEDIUMLOWSee also on each; merge at story authoring (Phase G)Chief Architect
R-18Added v1.6. Dispositions "not for a system", "not the ministry's" and "already required" were often made from the register row, which is lossy, and in some cases from the summary of the existing requirementMEDIUMMEDIUMReasons recorded per provision in the ledger; sample check before M9 is scopedChief Architect
R-19Added v1.6. A scope decision removes a conditional group after design has started on a shared capability it shaped, such as recurring time limits or record classes kept apartLOWMEDIUMConditional requirements grouped and marked; platform criteria that come only from a conditional area say soMinistry CIO

Risk Scoring: Probability × Impact = Risk Level

  • High Risk (Red): R-1, R-5, R-7, R-8. Escalate to executives through the architecture's decision owners.
  • Medium Risk (Yellow): R-2, R-3, R-4, R-6, R-9, R-10, R-11, R-13. Monitor actively.
  • Low Risk (Green): R-12. Accepted until DEP-14 reports.